Virtual Tour
Graduate Studies
Materials Science and Engineering
Chemical Engineering
Environmental Engineering
Biotechnology and Food Engineering
Physics
Mathematics with Computer Science
Chemistry
Mechanical Engineering (Robotics)
Research Overview
- Research Centers
MATEC
Electron Microscopy Center
X-ray Laboratory
ChE & EnvE Central Lab
BFE Core Facility
Chemistry Analytical Instrumentation Core
- Researchers
- Research Fellowship
- GTEC
Campus EHS
IT Services
Academic Technologies
Undergraduate Studies
- Mainland Chinese Students
- Hong Kong, Macau and Taiwan Students
- International Students
Graduate Studies
PostTime:7/1/2017

?Overview of the North Campus
The preparation period is coming in August. How about the recent construction progress of GTIIT North Campus? The following is the latest photos which were taken in the late June. Go!
In line with the blueprint, the North Campus, with an overall floorage is 101,700 m2, is in the front of the lush green Sangpu Mountain. Research Building, Administration Building, Teaching Laboratories, Visitors & Innovation Center, Canteen, Student Dorms, Staff Dorms are located from east to west on the stripe-shade GTIIT North Campus.
?

?

?Students Dorms
?
The four student dormitories, totally 274 rooms in accommodation for 1060 students. Beds, desks and cooking utensil will be ready before May 15th, since the decoration has drawn to an end, said Zheng Weicheng, the director of the site operation. An undergraduate is supposed to share a suite with three students, while two of them will share a bedroom in the suite.
?
Facing the south, the suite is around 45 m2, with two bedrooms and a living room. Each bedroom and living room is about 15 m2. Every suite has its balcony and is equipped with an air conditioner and a washing machine. The living room consists of a bathroom, a wash basin and a well-equipped kitchen.
?

?

?

?

?

?

Canteen
The eye-catching projects for teaching laboratories, such as pipe network and infrastructure for experiments, are progressing rapidly, which is supposed to be completed at the end of this year. Equipped with advanced instruments, the teaching laboratories are strictly complied with international standards and that of Technion, thereby enjoying high security standards. Since students are supposed to study elementary courses in their first year, the progress of teaching laboratories won't affect their undergraduate study. The South Campus will be the main campus in the future. The construction plan for the South Campus has been decided, which will be carried out soon.
?
?
© GUANGDONG TECHNION-ISRAEL INSTITUTE OF TECHNOLOGY | 粤ICP备17036470号
