Virtual Tour
Graduate Studies
Materials Science and Engineering
Chemical Engineering
Environmental Engineering
Biotechnology and Food Engineering
Physics
Mathematics with Computer Science
Chemistry
Mechanical Engineering (Robotics)
Research Overview
- Research Centers
MATEC
Electron Microscopy Center
X-ray Laboratory
ChE & EnvE Central Lab
BFE Core Facility
Chemistry Analytical Instrumentation Core
- Researchers
- Research Fellowship
- GTEC
Campus EHS
IT Services
Academic Technologies
Undergraduate Studies
- Mainland Chinese Students
- Hong Kong, Macau and Taiwan Students
- International Students
Graduate Studies
PostTime:5/31/2020
How is GTIIT South Campus going during the past 30 days??Come with me to know more.

The masonry work of the Stadium stands have been 90% completed. Are you looking forward to seeing an outdoor concert here in the future?

The second floor of the Gymnasium is under construction. Will you be the one who is sprinkling the blood and youth on the basketball court?

The second floor of Building A of Staff Dormitory is under construction. More excellent teachers are welcome to join GTIIT!

The Staff Dormitory Building BC has been capped, and the interior decoration is in full swing. What will the dormitory building look like? Let's wait and see together.

The?earthwork excavation of the?Innovation Research and Development Center has been 90%?completed. Your idea will be germinated here!
Next month, we will show you a 360-degree panoramic view of the South Campus. Please follow us.
Text:?GTIIT Campus Construction
Photo: GTIIT News and Public Affairs
© GUANGDONG TECHNION-ISRAEL INSTITUTE OF TECHNOLOGY | 粤ICP备17036470号
